The following table describes the "Production setup" extensions in KUMAVISION factory365 with links to the topics.

Field Description
Testing overproduction Checking deviations from the target production quantity.

See Overproduction
Mandatory field check Workstation If the switch is set, the mandatory field check for workstations is activated.

See Mandatory field check
Mandatory field check work center group If the switch is set, the mandatory field check for workstation groups is activated.

See Mandatory field check
Standard tolerance period Too early Defines the time period for the tolerance period (too early).

See Two-way tolerance
Standard tolerance period Too late Defines the time span for the tolerance period (Too late).

See Two-way tolerance
Retain operating cycle values Activate the switch if you want to retain the work process description.

See Retain operating cycle values
Separator Aisle no. Personnel Define a prefix for the "Personnel" operation.

See Set up secondary operations
Basic operation no. Personnel Define a suffix for the "Personnel" operation.

See Set up secondary operations
Separator Operation no. Tool Specify a prefix for the "Tool" operation.

See Set up secondary operations
Basic operation No. Tool Define a suffix for the "Tool" operation.

See Set up secondary operations